All Projects
Page 14 of 15
- 962200-3
- I-95 Strategic Plan
- 962200-4
- S.R. 434 Corridor Study
- 992000-8
- S.R. 520 at S.R. 528 Eastbound Ramps Safety Improvements
- 992100-6
- Alafaya Trail (S.R. 434) at Dalton Drive Median Modifications
- 992200-1
- S.R. 40 ( West Granada Boulevard ) at Water Oak Lane.
- 992200-2
- U.S. 1 and Marion Avenue
- 992300-1
- S.R. A1A North of Watson Drive & North of East Coral Way
- 992400-2
- SR 415 at Sterling Meadows Way
- 992400-4
- S.R. 527 (South Orange Avenue) at Cortland on Orange Apartments
- 992500-1
- U.S. 27/301/441 (S.R. 500) at NW 8th Street Safety Improvements
- 992500-2
- U.S. 1 (Ridgewood Avenue) at Homeport Terrace
- 992500-3
- S.R. 200 at SW 62nd Avenue & SW 73rd Street Rd
- 992500-5
- U.S. 92 (International Speedway Boulevard) at Red John Drive
- 992500-6
- S.R. 19 at C.R. 455
- 992500-7
- U.S. 301 at Northeast 175th Street Road
- 992500-9
- U.S. 1 at Masterson Street and Lake Washington Road/Riverdale Drive.
- 992501-1
- U.S. 27 at Independence Boulevard
- 992501-2
- U.S. 17-92 at School Street
- 992501-4
- S.R. A1A at 11th Avenue
- 992501-6
- I-4 WB Ramp at Orange Camp Road Signal