-
Monday, January 5 to Sunday, January 11: Motorists should anticipate continuous lane closures in the right turn lane of eastbound State Road (S.R.) 436 onto southbound S.R. 434. These closures are being done to make way for crews as they work to remove the pedestrian island, install drainage, reconstruct a new pedestrian landing, and perform drill shaft work.
Monday, January 5 to Sunday, January 11: Motorists should anticipate continuous lane closures in the right turn lane of westbound State Road (S.R.) 436 onto northbound S.R. 434. These closures are being done to make way for crews as they work to reconstruct a new pedestrian landing.
Monday, January 5 to Sunday, January 11: Motorists should anticipate continuous lane closures in the right turn lane of northbound State Road (S.R.) 434 onto eastbound S.R. 436. These closures are being done to make way for crews as they work to remove the pedestrian island, install drainage and reconstruct a new pedestrian landing.
Monday, January 5 to Sunday, January 11: Motorists should anticipate continuous lane closures in the right turn lane of southbound State Road (S.R.) 434 onto westbound S.R. 436. These closures are being done to make way for crews as they work to repair the signal infrastructure at this corner.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, January 5 to Thursday, January 8, from 9 p.m. to 7 a.m. the following morning: Motorists can expect alternating double-lane closures in the northbound and southbound inside and outside lanes of State Road (S.R.) from S.R. 414 to S.R. 436. These closures are necessary for crews to safely perform thermoplastic striping work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!