-
Monday, February 23 through Friday, February 27, from 7 a.m. to 5:30 p.m.: Motorists can expect a shoulder closure on the southbound I-95 exit ramp to S.R. 46 (Exit 223). All exits will remain open at all times.
The ramp will be temporarily reduced to 11 ft wide.
These closures are needed for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, February 22 through Thursday, February 26, from 7 p.m. to 7 a.m.: Motorists can expect outside single-lane closures on southbound I-95 from S.R. 46 (Exit 223) to SOF S.R. 50 (Exit 215).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, Feb. 22, through Friday, Feb. 27, from 7 a.m. to 7 p.m.: Motorists should be advised that there will be rotating northbound and southbound lane closures as needed along S.R. 33, from Domenico Court to Parkwood Street, for roadway drainage and sidewalk construction.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.
-
Overnight on Sunday, Feb. 22, through overnight on Friday, Feb. 27, from 7 p.m. to 7 a.m.: Motorists should be advised that there will be rotating northbound and southbound lane closures as needed along S.R. 33, from Domenico Court to Parkwood Street, for installation of curb and gutter, as well as barrier wall repair.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.