Monday, February 9 through Friday, February 13, from 7 a.m. to 5:30 p.m.: Motorists can expect a shoulder closure on the northbound I-95 exit ramp to S.R. 46 (Exit 223). All exits will remain open at all times.
The ramp will be temporarily reduced to 11 ft wide for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, February 9 through Thursday, February 12, from 7 p.m. to 7 a.m.: Motorists can expect outside single-lane closures on southbound I-95 from S.R. 46 (Exit 223) to SOF S.R. 50 (Exit 215).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Overnight on Monday, Feb. 9, through overnight on Tuesday, Feb. 10, from 7 p.m. to 7 a.m.: There is a possibility of rotating, moving lane closures for paving on S.R. 50 in the area of the project. However, paving operations could be suspended due to low temperatures on some days.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.