View project: U.S. 1 (S.R. 5) from Myers Drive to Crane Creek Bridge
-
Tuesday, September 8 through Friday, September 11, from 7:30 p.m. to 6:30 a.m.: Motorists can expect intermittent inside and outside lane closures on southbound and northbound U.S. 1 (S.R. 5) from Myers Drive to Crane Creek Bridge.
These closures are needed for roadway striping operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Thursday, September 10 to Friday, September 11, from 7:30 p.m. to 6:30 a.m.: Motorists can expect intermittent outside lane and shoulder closures on northbound U.S. 1 (S.R. 5) from Prospect Avenue to University Boulevard.
These closures are needed for roadway paving operations and utilities work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Tuesday, September 8 through Sunday, September 13: Motorists can expect continuous outside right-turn lane and shoulder closures on southbound U.S. 1 (S.R. 5) from University Boulevard to WH Jackson Street.
These closures are needed for roadway striping operations, drainage structure installation, and concrete work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!