View project: Pineda Causeway (S.R. 404) from U.S. 1 (S.R. 5) to S.R. A1A
-
Sunday, July 26 through Thursday, July 30, from 7 p.m. to 7 a.m.: Motorists can expect intermittent inside and outside lane closures on eastbound and westbound Pineda Causeway (S.R. 404) from U.S. 1 (S.R. 5) to S.R. A1A.
These closures are needed for paving operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, July 26, from 7 p.m. to 5 a.m.: Motorists can expect two temporary traffic holds of up to 15 minutes each on eastbound and westbound Pineda Causeway (S.R. 404) at South Patrick Drive. Law enforcement officers will be on site to safely direct traffic during the closures.
These traffic holds are needed for Florida Power & Light (FPL) to replace a damaged overhead power line crossing the roadway.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, July 19 through Thursday, July 23, from 7 p.m. to 7 a.m.: Motorists can expect intermittent inside and outside lane closures on eastbound and westbound Pineda Causeway (S.R. 404) from U.S. 1 (S.R. 5) to S.R. A1A.
These closures are needed for paving operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!