435859-4 S.R. 50 from east of C.R. 757 to C.R. 711
Project Details
About
PROJECT DESCRIPTION
The Florida Department of Transportation (FDOT) will increase the capacity and improve safety performance of State Road (S.R.) 50 from just east of County Road (C.R.) 757 to C.R. 711. S.R. 50 will be widened from two to four lanes with a 40-foot-wide median.
Median openings and left-turn lanes will be provided to maintain access. Also, FDOT will construct a new two-lane roundabout at the intersection of S.R. 50 and S.R. 471. All new curbs and curb ramps will be constructed to meet current Americans with Disabilities Act (ADA) standards.
A second project, which has not been scheduled, will increase capacity from C.R. 711 to the Sumter County line and will add a roundabout at S.R. 50 and C.R. 469. Shared-use paths are planned for both projects to run along the south side of S.R. 50 and connect to the Van Fleet Trail.
WHAT TO EXPECT
Motorists should anticipate areas of uneven pavement within the project limits, a common condition during construction when the contractor applies multiple layers of asphalt in phases. These roadway conditions are temporary and will improve gradually as the project progresses.
Lane closures can be expected at any time during active work hours. Additionally, posted speed limits will remain in effect. While workers are on site, motorists are strongly encouraged to exercise caution and reduce
speed to ensure the safety of everyone on the roadway. The project timeline is subject to change due to inclement weather or other unforeseen circumstances.