992500-9 U.S 1 at Masterson Street & U.S 1 at Washington Road/Riverdale Dr. - Upgrade Flasher to Full Signal / Signal Modification
Project Details
| Work Type: | Traffic Signal Work |
|---|---|
| Phase: | Design |
| Length: | 0.1 miles |
| Design Cost: | $120,000 |
Estimated Costs
| Construction Cost: | $580,000 |
|---|
About
The Florida Department of Transportation (FDOT) will soon begin construction of safety improvements along U.S. 1 at the intersections of Masterson Street and Lake Washington Road/Riverdale Drive in Brevard County.
The project includes upgrading the existing flashing signal at U.S. 1 and Masterson Street to a fully operational traffic signal with crosswalks and pedestrian crossing signals. In addition, existing traffic signal heads will be upgraded at the intersection of U.S. 1 and Lake Washington Road/Riverdale Drive.
These improvements are designed to enhance traffic operations and improve safety for motorists, pedestrians, and cyclists traveling through the corridor.