Launch Recite Me assistive technology

exclamation point FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Traffic Signal Work
Phase: Design
Length: 0.1 miles
Design Cost: $120,000
Estimated Costs
Construction Cost: $580,000
About

The Florida Department of Transportation (FDOT) will soon begin construction of safety improvements along U.S. 1 at the intersections of Masterson Street and Lake Washington Road/Riverdale Drive in Brevard County.

The project includes upgrading the existing flashing signal at U.S. 1 and Masterson Street to a fully operational traffic signal with crosswalks and pedestrian crossing signals. In addition, existing traffic signal heads will be upgraded at the intersection of U.S. 1 and Lake Washington Road/Riverdale Drive.

These improvements are designed to enhance traffic operations and improve safety for motorists, pedestrians, and cyclists traveling through the corridor.

Contact Information
Design Project Manager
David Brock
(386) 943-5316
David.Brock@dot.state.fl.us