992501-6 I-4 WB Ramp at Orange Camp Rd. (New Traffic Signal)
Project Details
| Work Type: | Lighting |
|---|---|
| Phase: | Design |
| Length: | 0.01 miles |
| Design Cost: | $100,000 |
About
The project at the intersection of I-4 WB Ramp at Orange Camp Rd. in Volusia County is intended to enhance overall safety and improve traffic operations. A traffic services study conducted by the Department determined that a new traffic signal is warranted at this location.
As part of the Traffic Operations Pushbutton Program, the scope of work includes the installation of a new traffic signal.
Contact Information
| Design Project Manager |
|---|
|
Gabriel Fritz
(407) 965-5839
Gabriel.Fritz@dot.state.fl.us
|