All Projects
Page 3 of 18
- 433651-1
- C.R. 484 from SW 20th Avenue to C.R. 475A
- 433660-1
- U.S. 441 at S.R. 464 Intersection Improvements
- 434414-1
- S.R. 514 from east of S.R. 507 to U.S. 1
- 435209-1
- I-75 at NW 49th Street Interchange
- 435471-1
- South Sumter Connector Trail Project Development and Environmental (PD&E) Study
- 435476-1
- I-75 at C.R. 514 Interchange PD&E Study
- 435476-2
- I-75 at C.R. 514 Interchange PD&E Study
- 435627-1
- U.S. 1 Corridor Planning Study
- 435628-1
- S.R. 520 Corridor Study in Brevard County
- 435632-1
- S.R. 518 (Eau Gallie Boulevard) Beachside Corridor Planning Study
- 435729-1
- S.R. 436 (Semoran Boulevard) Corridor Planning Study
- 435730-1
- Orange Avenue (S.R. 527) Corridor Planning Study (North)
- 435735-1
- U.S. 92 (International Speedway Boulevard) Pedestrian Connectivity & Safety Assessment
- 435777-1
- S.R. 434 (Longwood) Corridor Study
- 435859-1
- S.R. 50 PD&E Study from U.S. 301 in Hernando County to C.R. 33 in Lake County
- 435859-4
- S.R. 50 from east of C.R. 757 to east of the Sumter/Lake County Line
- 435859-5
- S.R. 50 from east of the Sumter/Lake County Line to C.R. 33
- 436187-1
- S.R. 406 Corridor Planning Study
- 436292-1
- I-95 Interchange at Pioneer Trail
- 436360-1
- S.R. 40 Black Bear Trail Corridor Planning Study