Project Details
Work Type: Drainage Construction
Phase: Design
Length: 0.127 miles
City:
County:
Road:
Letting: 02/07/2023
Estimated Costs
Construction Cost: $4.5 Million
About

This project makes improvements to the existing storm drainage system to alleviate flooding along East Colonial Drive (State Road 50) at the intersections of  Irvington Avenue, Lakewood Drive, and Maguire Boulevard. The improvements are expected to also benefit adjacent properties during periods of heavy rainfall.  

Contact Information
Design Firm
Connelly and Wicker, Inc
Design Project Manager
Eliode Joseph
(386) 943-5388