Future Projects
Page 3 of 11
- 435735-1
- U.S. 92 (International Speedway Boulevard) Pedestrian Connectivity & Safety Assessment
- 435777-1
- S.R. 434 (Longwood) Corridor Study
- 435859-1
- S.R. 50 PD&E Study from U.S. 301 in Hernando County to C.R. 33 in Lake County
- 435859-5
- S.R. 50 from east of the Sumter/Lake County Line to C.R. 33
- 436187-1
- S.R. 406 Corridor Planning Study
- 436360-1
- S.R. 40 Black Bear Trail Corridor Planning Study
- 436394-1
- Robinson Street Corridor Study
- 437131-1
- S.R. 50 from Irvington Avenue to Maguire Boulevard
- 437174-1
- S.R. 535 Corridor Study
- 437174-2
- S.R. 535 (Vineland Road) from U.S. 192 to north of (S.R. 536) World Center Drive
- 437175-1
- S.R. 535 Concept Development Study
- 437200-1
- U.S. 17-92 Project Development and Environment (PD&E) Study
- 437200-2
- U.S. 17-92 from Ivy Mist Lane to Avenue A
- 437204-1
- Babcock Street PD&E Study
- 437241-1
- S.R. 519 (Fiske Boulevard) Corridor Planning Study
- 437398-1
- U.S. 92 (International Speedway Boulevard) Corridor Master Management Plan
- 437606-1
- East Central Florida Corridor Task Force
- 437983-1
- S.R. 524 PD&E Study
- 438562-2
- I-75 (S.R. 93) Sumter County Northbound Rest Area
- 439238-2
- U.S. 441 from SE 102nd Place to S.R. 200 (SW 10th Street)