Future Projects
Page 11 of 11
- 962200-4
- S.R. 434 Corridor Study
- 992400-4
- S.R. 527 (South Orange Avenue) at Cortland on Orange Apartments
- 992500-2
- U.S. 1 (Ridgewood Avenue) at Homeport Terrace
- 992500-9
- U.S 1 at Masterson Street & U.S 1 at Washington Road/Riverdale Dr.
- 992501-1
- U.S. 27 at Independence Boulevard - New Traffic Signal
- 992501-2
- U.S 17-92 at School Street - Install new strain pole traffic signal
- 992501-4
- S.R. A1A at 11th Avenue - Installation of a new crosswalk with RRFBs, ramps, & lighting design RISA
- 992501-6
- I-4 WB Ramp at Orange Camp Road Signal
- 992501-7
- I-75 NB Exit Ramp at C.R. 475 - Installation of new traffic signal
- 992501-8
- S.R. 35 at SE 38th Street - New Signal w Peds and Lighting
- 992502-1
- S.R. 50 at Montevista Road - Traffic Signal
- 992502-2
- S.R. 438 at Pioneer Road - Traffic Signal
- 992502-4
- S.R. 527 at Park Lake Street - RRFB Crossing and Lighting
- 992502-7
- S.R. 50 at Amber Road - New RCUT Signal with Peds, RISA Lighting
- 992502-8
- S.R. 33 at C.R. 474 - New Signal, No Peds, RISA Lighting
- 992503-9
- SR 406 (Garden St) at Christian Court - Median Modification
- 992600-1
- U.S. 92 at Marsh Road - New Traffic Signal
- 992603-1
- SR 19 at CR 19A - New Traffic Signal