Future Projects
Page 11 of 12
- 455216-1
- S.R. 100 at Flagler Avenue Signal Improvements
- 455946-1
- I-4 from E.E. Williamson Road to south of Lake Mary Boulevard
- 456096-1
- S.R. 50 from Avalon Park Blvd to East of Econ River Bridge
- 456096-2
- S.R. 50 from East of Econ River Bridge to Chuluota Road
- 456175-1
- U.S. 1 Shoreline Stabilization PD&E Study
- 456269-1
- I-4 North Volusia County PD&E Study
- 458021-1
- S.R. 19 from S.R. 50 to C.R. 455 PD&E Study
- 962200-1
- Maitland Areawide Study
- 962200-3
- I-95 Strategic Plan
- 962200-4
- S.R. 434 Corridor Study
- 992400-4
- S.R. 527 (South Orange Avenue) at Cortland on Orange Apartments
- 992500-6
- S.R. 19 at C.R. 455 - Installation of new traffic signal and upgraded intersection lighting
- 992500-7
- U.S. 301 at NE 175th Street Road - Installation of new traffic signal
- 992500-9
- U.S 1 at Masterson Street - Upgrade Flasher to a Full Traffic Signal and install upgraded intersection lighting
- 992501-1
- U.S. 27 at Independence Boulevard Signal
- 992501-2
- U.S 17-92 at School Street - Install new strain pole traffic signal
- 992501-4
- S.R. A1A at 11th Avenue - Installation of a new crosswalk with RRFBs, ramps, & lighting design RISA
- 992501-6
- I-4 WB Ramp at Orange Camp Road Signal
- 992501-7
- I-75 NB Exit Ramp at C.R. 475 - Installation of new traffic signal
- 992501-8
- S.R. 35 at SE 38th Street - New Signal w Peds and Lighting