Work Type: Median Modification
Phase: Construction
Length: 0.1 miles
About

The project located at the intersection of SR 406 (Garden St) at Christian Court is designed to improve overall safety and traffic operations. A traffic services study conducted by the Department concluded that Bi-Directional Median are warranted at this location. As part of the Traffic Operations Pushbutton Program, the scope of work includes installing Bi-Directional Median from SR 406 (Garden St) at Christian Court within the intersection area.

Contact Information
Communications Team
Abid Virani
(407) 641-0692
Abid.Virani@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.