Brevard County Future Projects
Page 2 of 3
- 445618-1
- S.R. A1A over Sebastian Inlet - Bridge Replacement PD&E Study
- 446600-1
- S.R. 519 at Roy Wall Boulevard
- 447608-1
- East Coast Greenway/U.S. 1 Trail from S.R. 50 to Grace Street
- 447699-1
- S.R. 405 Corridor Study
- 449296-1
- S.R. A1A Crossing North of Atlantic Boulevard
- 450594-1
- I-95 from S.R. 46 to southbound I-95 Rest Area
- 450626-1
- S.R. 406 from I-95 to Forrell Avenue
- 450627-1
- S.R. A1A from Oak Street to U.S. 192
- 451247-1
- S.R. 507 (Babcock Street) at Eber Boulevard/Pirate Lane
- 451594-1
- I-95 from Citrus Boulevard to the Addison Canal
- 452685-1
- S.R. 528 from west of Sykes Creek to S.R. 401
- 452688-1
- S.R. A1A from S.R. 520 to George King Boulevard
- 452688-2
- S.R. A1A Pedestrian Crossing
- 452864-1
- S.R. 507 from north of Palm Bay Road to Melbourne Avenue
- 452883-1
- Southbound U.S. 1 from north of Rocky Point Road to south of S.R. 514
- 452885-1
- S.R. 520 from west of S.R. 524 to Tucker Lane
- 453311-1
- S.R. 3 from Catalina Isle Drive to north of S.R. 528 eastbound Ramps
- 454219-1
- Sarno Rd from SR 518 to Wickham Rd
- 454220-1
- S.R. 405 from S.R. 50 to south of Bobbi Ln
- 454250-1
- U.S. 1 at Valkaria Road