Launch Recite Me assistive technology

exclamation point FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Maintenance Resurfacing
Phase: Design
Length: 1.412 miles
City:
County:
Road:
Letting: 07/06/2028
Estimated Costs
Construction Cost: $1.5 Million
About

This project proposes to resurface a segment of State Road (S.R.) 405 from Swan Lake Drive to Angela Lane in Titusville to rehabilitate the asphalt to maintain the road and provide an improved driving surface. In addition to repaving the roadway, the project will upgrade pedestrian curb ramps as needed, refresh pavement markings and upgrade signs as needed for safety.

Contact Information
Design Project Manager
Rebecca Plumlee
(386) 943-4020
Rebecca.Plumlee@dot.state.fl.us