454893-1 S.R. 518 from S.R. 513 to S.R. A1A
Project Details
| Work Type: | Safety Project |
|---|---|
| Phase: | Design |
| Length: | 1.065 miles |
| City: | |
| County: | |
| Road: | |
| Design Cost: | $926,000 |
| Letting: | 03/29/2028 |
Estimated Costs
| Construction Cost: | $1.4 Million |
|---|
About
The purpose of this safety project is to implement recommendations from a Pedestrian Safety Study on State Road (S.R.) 518 (Eau Gallie Boulevard) in Indian Harbour Beach and Melbourne. Proposed improvements include:
- Install a raised median to help reduce left turn and angle crashes near the shopping center on the southeast quadrant of the N. Riverside Drive intersection.
- Construct new signalized pedestrian crossings at Mediterranean Way and San Pedro Drive
- Construct a raised channelizing island at the Walmart Driveway
- Creating a new pedestrian crossing at the signalized Walmart intersection.
Contact Information
Design Project Manager
Tyler Paura
(386) 943-5466
Tyler.Paura@dot.state.fl.us