454220-1 S.R. 405 from S.R. 50 to south of Bobbi Ln
Project Details
| Phase: | Design |
|---|---|
| Length: | 1.522 miles |
| City: | |
| County: | |
| Road: | |
| Letting: | 07/06/2028 |
Estimated Costs
| Construction Cost: | $2.1 Million |
|---|
About
This is a maintenance resurfacing project on State Road (S.R.) 405 from S.R. 50 to south of Bobbi Lane in Titusville, Brevard County. The purpose of the project is to rehabilitate the asphalt pavement to maintain a safe and reliable driving surface.
The project will also reconstruct pedestrian curb ramps where needed in accordance with current Americans with Disabilities Act (ADA) standards.
Contact Information
Design Project Manager
Stan Carroll
(386) 943-5346
William.Carroll@dot.state.fl.us