Project Details
Phase: Design
Length: 1.95 miles
City:
County:
Road:
Design Cost: $457,000
Letting: 12/01/2026
Estimated Costs
Construction Cost: $4.6 Million
About

This project plans to repave a section of State Road (S.R.) 520 (King Street) from west of S.R. 524 to Tucker Lane near Cocoa to maintain a safe and reliable driving surface. Plans will also include upgrading pedestrian curb ramps as needed to comply with current Americans with Disabilities Act (ADA) standards, refreshing pavement markings to enhance visibility, and installing audible vibratory pavement features that alert drivers if the vehicle veers out of the lane.