Marion County All Projects
Page 1 of 2
- 238648-1
- U.S. 41 from SW 110th Street to north of S.R. 40
- 238651-1
- S.R. 200 from Citrus County line to C.R. 484
- 410674-2
- S.R. 40 from end of 4 lanes to C.R. 314
- 410674-3
- S.R. 40 from east of C.R. 314 to east of C.R. 314A
- 410674-4
- S.R. 40 from east of C.R. 314A to Levy Hammock Road
- 433651-1
- C.R. 484 from SW 20th Avenue to C.R. 475A
- 433660-1
- U.S. 441 at S.R. 464 Intersection Improvements
- 435209-1
- I-75 at NW 49th Street Interchange
- 436360-1
- S.R. 40 Black Bear Trail Corridor Planning Study
- 438562-1
- I-75 Northbound Rest Area Reconstruction between C.R. 484 and S.R. 200
- 439238-2
- U.S. 441 from SE 102nd Place to S.R. 200 (SW 10th Street)
- 440816-4
- I-75 (S.R. 93) Wrong Way Vehicle Detection System Installation in Marion and Sumter Counties
- 441626-1
- North Lake Trail Phase 3 from C.R. 450 to S.R. 40
- 443170-1
- I-75 Resurfacing from Sumter County Line to S.R. 200
- 443623-1
- I-75 (S.R. 93) from Turnpike (S.R. 91) to S.R. 200 (Master Plan)
- 443624-1
- I-75 (S.R. 93) from S.R. 200 to C.R. 234 (Master Plan)
- 445218-1
- U.S. 441 (S.R. 25) from Avenue I to the Alachua County Line
- 448376-1
- I-75 from S.R. 200 to north of U.S. 27
- 448526-1
- U.S. 41 from north of Citrus County Line to SW 110th Street
- 448635-1
- U.S. 441 (S.R. 25) from north of C.R. 25A to Avenue I