Future Projects
Page 12 of 12
- 992501-3
- U.S. 92 at General Custer Avenue EB Bus Bay
- 992501-5
- S.R. 426 at RRFB West of Tangerine Avenue - Retrofit RRFB crosswalk into overhead PHB crosswalk + LDAR
- 992501-6
- I-4 WB Ramp at Orange Camp Road Signal
- 992501-7
- I-75 NB Exit Ramp at C.R. 475 - Installation of new traffic signal
- 992501-8
- S.R. 35 at SE 38th Street - New Signal w Peds and Lighting
- 992501-9
- U.S. 41 at Rainbow Lakes Boulevard - Install new mast arm traffic signal with guardrail
- 992502-1
- S.R. 50 at Montevista Road Traffic Signal
- 992502-2
- S.R. 438 at Pioneer Road Signal
- 992502-5
- I-75 NB Exit Ramp at C.R. 475 - Installation of New Traffic Signal
- 992502-7
- S.R. 50 at Amber Road - New RCUT Signal with Peds, RISA Lighting
- 992502-8
- S.R. 33 at C.R. 474 - New Signal, No Peds, RISA Lighting
- 992502-9
- U.S. 27 at Independence Boulevard - Install a new traffic signal - No Peds
- 992503-2
- I-4 at EB Ramps at West Main Street - New Traffic Signal
- 992503-9
- SR 406 (Garden St) at Christian Court Safety Project
- 992600-1
- U.S. 92 at Marsh Road - Installation of new traffic signal with crosswalks and upgraded intersection lighting
- 992600-3
- S.R. A1A north of River Woods Boulevard (Installation of new crosswalk)
- 992601-1
- S.R. 19 at Cherry Lake Road - New Signal, No Peds, RISA lighting