-
Monday, January 19 through Friday, January 23, from 8 a.m. to 5 p.m.: Motorists can expect a shoulder closure southbound I-95 at the off ramp to S.R. 46 (Exit 223). All exits will remain open at all times.
The ramp will be temporarily reduced to 11 ft wide for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, January 19 through Friday, January 23, from 8 a.m. to 5 p.m.: Motorists can expect inside lane closures southbound and northbound S.R. I-95 from S.R. 50 (Exit 215) to S.R. 46 (Exit 223).
These closures are needed for guardrail and ditch pavement work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, January 18 through Thursday, January 22, from 7 p.m. to 7 a.m.: Motorists can expect alternating inside and outside double lane closures southbound S.R. I-95 from Eau Gallie Boulevard (Exit. 183) to U.S. 192 (Exit 180).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!