-
Tuesday - Thursday: Motorists are advised that a nighttime single lane closure from 9 p.m. to 5 a.m. will be in place on Pioneer Trail, from west of Williamson Boulevard to east of Turnbull Bay Road, to install drainage structures. Flagging operations will be in place to help guide motorists through the single-lane closures.
In addition to the lane closure, a new stop pattern was installed at the intersection of Pioneer Trail and Turnbull Bay Road. The intersection is now operating as a three-way stop.
FDOT is committed to building a transportation system that not only fits the current needs of Florida’s residents and visitors but also enhances mobility throughout the state to accommodate its consistent and rapid growth.
-
Sunday, Nov. 9, through Thursday, Nov. 13, from 9 p.m. to 6 a.m., motorists can expect intermittent inside and outside single lane closures on eastbound and westbound Granada Boulevard (State Road (S.R.) 40) from S.R. A1A to S.R. 5 to work on concrete work, striping operations, and signalization.