Project Details
Work Type: Resurfacing
Phase: Construction
City:
County:
Road:
Construction Cost: $20.4 Million
Project Start: Early 2025
Est. Completion: Fall 2026
About

The Florida Department of Transportation (FDOT) is making safety and operational enhancements along State Road (S.R.) A1A (Ocean Shore Boulevard) from north of E. Granada Boulevard (S.R. 40) to north of Roberta Road in Ormond Beach.

The project incorporates features proposed through the North Ormond Beach Area Coalition planning effort. Enhancements include alignment shifts to encourage safer driving speeds, curb and gutter improvements, and the addition of left turn lanes at the intersection of Neptune Avenue. The speed limit of 35 mph throughout the corridor was reduced to 30 mph during construction and will remain 30 mph after project completion.

To improve pedestrian safety, a new 6-foot-wide sidewalk is being constructed on the east side of the road where space allows, and a 10-foot-wide shared-use path is being built on the west side. Existing pedestrian curb ramps are being upgraded to meet current Americans with Disabilities Act (ADA) standards. Midblock crossings with raised sections and Rectangular Rapid Flashing Beacons (RRFBs) are being installed to enhance safety. Lastly, traffic signal improvements, lighting upgrades, and drainage modifications are also being added along the corridor.

To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:

Rectangular Rapid Flashing Beacon Video

How to Use the RRFB

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Contractor
Halifax Paving, Inc.
For Media Inquiries Only
Lane Closures
  • Friday, August 21 to Friday, August 28 from 7 a.m. to 7 p.m.: Motorists can expect flagging operations on northbound and southbound State Road (S.R.) A1A just north of Granada Boulevard. These temporary traffic operations are necessary for the contractor to complete concrete curb and gutter installation, clearing and grubbing, sidewalk work, and roadway widening.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!