Project Details
Work Type: Resurfacing
Phase: Design
Length: 16.978 miles
County:
Road:
Design Cost: $2.5 Million
Letting: 10/28/2026
Estimated Costs
Construction Cost: $16.3 Million
About

The purpose of this project is to resurface State Road (S.R.) 100 from the Putnam County line to west of U.S. 1 in Flagler County. The project also proposes to improve the connection of Deen Road to S.R. 100. Other proposed improvements include:

  • Evaluating existing guardrails to ensure they meet current safety standards. Guardrails will be reset or replaced where needed.
  • Adding audible vibratory pavement markings along the shoulders and centerline to reduce lane departures and crossover crashes.
  • Installing intersection lighting on S.R. 100 to improve visibility at the intersections of Water Oak Road, County Road (C.R.) 305, C.R. 302, and Deen Road.

A separate project is being planned to improve drainage along the corridor just west of the U.S. 1 overpass.