EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Study
Phase: Design
Length: 3.597 miles
City:
County:
Road:
Design Cost: $3.3 Million
Estimated Costs
Construction Cost: $23.7 Million
About

The Florida Department of Transportation (FDOT) is proposing improvements along Clyde Morris Boulevard (State Road (S.R.) 483) from Beville Road (S.R. 400) to north of Dunn Avenue in Daytona Beach. Using a Complete Streets approach, the project will be designed to improve safety for pedestrians, bicyclists, and drivers throughout the corridor. Elements under consideration include wider sidewalks or a shared-use path, sidewalk connectivity throughout the corridor, a center median with landscaping and other measures to help encourage safer vehicle speeds. Traffic signal upgrades where feasible, enhanced lighting, and necessary drainage improvements are included.

 

Contact Information
Design Project Manager
Ty Garner
(386) 943-5299
Ty.Garner@dot.state.fl.us
Design Firm
SAI Consulting Engineers, Inc.
Project Files