Work Type: Safety Project
Phase: Construction
Length: 0.1 miles
City:
County:
Road:
Construction Cost: $1.1 Million
Project Start: Early 2023
Est. Completion: Summer 2023
About

The purpose of the project is to signalize the pedestrian crossing on U.S. 41 (S. Williams Street) between Brittan Alexander Bridge and River Drive, near Dunnellon City Hall. This will enhance pedestrian safety by installing a Midblock Pedestrian Signal (MPS) to replace the existing pedestrian crossing at this location.

A public meeting for this project was held on 9/7/2021. Please see the public meeting information in the files below.

Contact Information
Communications Team
Natecia Gayle
(352) 326-7744 / (352) 620-3020
Natecia.Gayle@dot.state.fl.us
Lane Closures
  • Sunday, April 2, through Saturday, April 8, from 7 a.m. to 6 p.m.: Motorists should expect northbound and southbound daytime lane closures from Brittan Alexander Bridge to River Road for paving and signal operations. Please slow down approaching the construction zone, merge safely into the open lane(s) and proceed cautiously through the work area.

  • Sunday, March 26, through Saturday, April 1, from 7 a.m. to 6 p.m.: Motorists should expect northbound and southbound daytime lane closures from Brittan Alexander Bridge to River Road for paving and signal operations. Please slow down approaching the construction zone, merge safely into the open lane(s) and proceed cautiously through the work area.