Project Details
Work Type: Resurfacing
Phase: Construction
Length: 10.612 miles
City:
County:
Road:
Construction Cost: $15.7 million
Project Start: Early 2021
Est. Completion: Late 2021
About

The purpose of this project is to resurface U.S. 441 from State Road (S.R.) 35 (Baseline Road) to S.R. 200 (SW 10th Street). Additional improvements include modifications to extend left and right turn lanes at various locations, remove some of the existing on street parking, provide bicycle facilities within the right of way where possible, update and provide pedestrian features to meet current standards, and make other drainage and safety improvements, as needed. These improvements also include an almost half-mile portion of U.S. 27/U.S. 441 (SE Abshier Boulevard) east of County Road 484 (SE Hames Road).

The sidewalk gap and shared use path displayed in the attached project files are not included in this project.

Contact Information
Communications Team
Tom McNiff
(352) 620-3020
thomas.mcniff@dot.state.fl.us
Contractor
D.A.B. Constructors, Inc.
Lane Closures
  • Sunday, July 25, through Friday, July 30, from 7 p.m. to 7 p.m.: Southbound outside lane closure from Southwest 32nd Street to Southeast 80th Street and northbound inside lane closure from Southeast 80th Street to Southwest 32nd Street for paving.

  • Sunday, July 18 - Friday, July 23: Motorists should expect northbound and southbound lane closures between Southeast 98th Street and Southeast 102nd Street from 7 a.m. to 7 p.m. each day for drainage work. Lane closures will involve one lane at a time and the remaining lanes will stay open for the traveling public. Please slow down approaching the construction zone, merge safely into the open lane(s) and proceed cautiously through the work area.

  • Sunday, July 18 - Friday, July 23: Motorists should expect southbound lane closures from Southeast 40th Street to Southeast 80th Street from 7 p.m. to 7 a.m. for paving work. Lane closures will involve one lane at a time and the remaining lanes will stay open for the traveling public. Please slow down approaching the construction zone, merge safely into the open lane(s) and proceed cautiously through the work area.