Project Details
Work Type: Widening
Phase: Design
Length: .414 miles
City:
County:
Road:
Letting: 07/28/2021
Estimated Costs
ROW Cost: $3.8 Million
Construction Cost: $8.1 Million
About
The purpose of the project is to improve safety and traffic flow. Improvements include additional turn lanes and turn lane extensions at both the County Road (C.R.) 484 and Interstate 75 (I-75) interchange and the C.R. 484 and C.R. 475A intersection, reconstruction of the westbound through lanes, and modification of the existing I-75 bridge to accommodate the widening.

The project will also improve bicycle lane and pedestrian sidewalk connectivity through the project limits. Modifications to the existing median will be required for the roadway improvements. 

Contact Information
Design Firm
STV/Ralph Whitehead and Associates
Design Project Manager
Su Hao
(386) 943-5161
Su.Hao@dot.state.fl.us