Monday, January 26 through Friday, January 30, from 8 a.m. to 5 p.m.: Motorists can expect a shoulder closure southbound I-95 at the off ramp to S.R. 46 (Exit 223). All exits will remain open at all times.
The ramp will be temporarily reduced to 11 ft wide for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, January 26 through Friday, January 30, from 8 a.m. to 5 p.m.: Motorists can expect inside lane closures southbound and northbound S.R. I-95 from S.R. 50 (Exit 215) to S.R. 46 (Exit 223).
These closures are needed for guardrail and ditch pavement work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, Jan. 26, through Friday, Jan. 30, from 7:30 a.m. to 5:30 p.m.: There will be rotating northbound and southbound lane closures on S.R. 48, from Belt Avenue to Noble Avenue, as needed for sidewalk repair and sodding.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.