Project Details
Work Type: Safety Project
Phase: Design
Length: 4.407 miles
City:
Road:
Design Cost: $957,000
Letting: 07/27/2022
Estimated Costs
Construction Cost: $2.9 Million
About

This project will improve safety and operations along State Road (S.R.) 33 from south of Edgewood Boys Ranch Road to S.R. 50. Safety improvements for drivers include widening the existing paved shoulders through the curves in the road along Edgewood Boys Ranch Road and Groveland Airport Road and creating a new southbound left turn from S.R. 33 to Pine Island Road (County Road 565B). Additionally, the two-way left turn lane from Wright Street to S.R. 50 will be converted to a southbound only left turn lane. At the S.R. 33 and S.R. 50 intersection, the project also will reconstruct and upgrade the traffic signals, add crosswalks and sidewalk curb ramps, and upgrade pedestrian lighting.

Contact Information
Design Project Manager
Megan Owens
(386) 943-5140
Megan.Owens@dot.state.fl.us
Design Firm
GAI Consultants Southeast, Inc