992501-9 U.S. 41 at Rainbow Lakes Boulevard - Install new mast arm traffic signal with guardrail
Project Details
| Work Type: | Lighting |
|---|---|
| Phase: | Design |
| Length: | 0.01 miles |
| Design Cost: | $82,558.01 |
About
The project at the intersection of U.S. 41 at Rainbow Lakes Boulevard in Marion County is intended to improve overall safety and traffic operations. A traffic services study conducted by the Department determined that a new traffic signal is warranted at this location.
As part of the Traffic Operations Pushbutton Program, the project includes the installation of a new traffic signal with mast arms. Pedestrian signals are not included in this scope. Additional improvements involve the construction of guardrail within the intersection area to support the new infrastructure.
Contact Information
| Design Project Manager |
|---|
|
Gabriel Fritz
(407) 965-5839
Gabriel.Fritz@dot.state.fl.us
|