exclamation point FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Launch Recite Me assistive technology
Project Details
Work Type: Resurfacing
Phase: Design
Length: 3.119 miles
City:
County:
Road:
Design Cost: $1.2 Million
Letting: 01/31/2029
Estimated Costs
Construction Cost: $11.2 Million
About

This project plans to resurface a segment of U.S. 301 (State Road (S.R.) 35) from SE 142nd Place to U.S. 27/U.S. 441 (S.R. 500) to rehabilitate the asphalt and maintain a safe and roadway. The limits are partially within the City of Belleview in Marion County. 

Safety enhancements include adding right turn lanes at SE 140th Street, SE 135th Street and SE 132nd Street. A median modification is also being considered at SE 135th Street.

Buffered bicycle lanes can be accommodated by repurposing the parking lane along a portion of the corridor. Bicycle thru lanes next to right-turn lanes are also proposed. Pedestrian improvements include constructing small sections of connecting sidewalk and upgrading curb ramps as needed.

 

Contact Information
Design Project Manager
Randy Turner
(386) 943-5207
Randall.Turner@dot.state.fl.us