EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Design
Length: 3.829 miles
City:
County:
Road:
Design Cost: $2.8 Million
Letting: 04/29/2026
Estimated Costs
Construction Cost: $12 Million
About

The purpose of this project is to resurface E. Irol Bronson Highway, 13th Street and Vine Street (U.S. 192) from Main Street to Aeronautical Drive.

Contact Information
Design Project Manager
Jude Jean-Francois
(386) 943-5487
Jude.Jean-Francois@dot.state.fl.us