EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Safety Project
Phase: Construction
Length: 6.515 miles
City:
County:
Road:
Construction Cost: $1.4 Million
Project Start: Early 2026
Est. Completion: Summer 2026
About

The purpose of this project is to enhance pedestrian safety along State Road (S.R.) A1A in Daytona Beach and Daytona Beach Shores. The project will install two new midblock crossings with pedestrian activated signals called Rectangular Rapid Flashing Beacons (RRFBs) at Sea Spray Street/Andrianopoulos Park and near Browning Avenue. RRFBs are pedestrian-activated signals that display flashing yellow lights to alert drivers that a pedestrian is ready to cross. By state law, vehicles must stop at all marked crosswalks when a pedestrian is present. 

To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:

Plans also call for upgrading the other seven existing pedestrian crossings by adding in-road lighting and overhead lighting. 

This project is being constructed with a resurfacing project that extends from U.S. 1 (Ridgewood Avenue) to Davis Street (FPID No. 450666-1).

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Contractor
C. W. Roberts Contracting, Inc.
For Media Inquiries Only
FDOT-D5Comm@dot.state.fl.us
Lane Closures
  • Monday, March 9, to Friday, March 13, from 7 a.m. to 5 p.m.: Motorists can expect outside single lane closures on southbound State Road (S.R.) A1A from Ribault Avenue to Cheshire Road to allow for the removal of concrete.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!

Goes With
Project Files