450640-1 S.R. 436 from U.S. 441 to Seminole County Line
Project Details
About
The purpose of this project is to resurface Semoran Boulevard (State Road (S.R.) 436) from U.S. 441 to the Seminole County line. The project will also upgrade pedestrian curb ramps as needed to comply with current Americans with Disabilities Act (ADA) standards. Construction will also include upgrades to the signal detection to improve traffic flow throughout the project corridor.
Contact Information
Lane Closures
-
Monday, July 27 to Friday, July 31, from 8 p.m. to 6 a.m. the following morning: Motorists can expect alternating inside and outside single-lane closures in both directions of S.R. 436, between South Orange Blossom Trail (U.S. 441), and the Seminole County Line. These closures are necessary for crews to perform thermoplastic striping work along the corridor.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!