450595-1 I-95 from Indian River County Line to Babcock Street
Project Details
| Work Type: | Resurfacing |
|---|---|
| Phase: | Construction |
| Length: | 12.5 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $26.6 million |
| Project Start: | Summer 2026 |
| Est. Completion: | Late 2027 |
About
The Florida Department of Transportation (FDOT) is resurfacing approximately 12.5 miles of Interstate 95 (I-95) from the Indian River County line to Babcock Street (State Road (S.R.) 507). Interchange ramps at St. Johns Heritage Parkway are being milled and resurfaced, extending the roadway’s service life and enhancing safety for the traveling public. Additional safety enhancements include guardrail upgrades at designated locations.
Contact Information
Lane Closures
-
Sunday, September 27 to Thursday, October 1, from 8 p.m. to 7 a.m. the followng morning: Motorists can expect intermittent single-lane closures in the inside lanes and inside shoulder of northbound and southbound Interstate 95 (I-95) from Babcock Street to the Indian River County Line. These closures are necessary for crews to perform milling and paving operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Sunday, September 20 to Friday, September 25, from 8 p.m. to 7 a.m.: Motorists can expect intermittent double-lane closures in the inside and middle lanes of northbound and southbound Interstate 95 (I-95) from Babcock Street to the Indian River County Line. These closures are necessary for crews to perform milling and paving operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!