Project Details
Work Type: Resurfacing
Phase: Construction
Length: 2.087 miles
City:
County:
Road:
Construction Cost: $6.8 Million
Project Start: Spring 2026
Est. Completion: Spring 2027
About

The purpose of this project is to repave a segment of State Road (S.R.) 436 from Lake Howell Road to the Orange County line to extend the service life of the roadway, and pedestrian crosswalks and curb ramps will be updated as needed in accordance with current Americans with Disabilities Act (ADA) standards. Construction will also include the addition of raised concrete channelizing islands at several locations along the corridor to improve traffic flow and reduce conflict points.

Contact Information
Communications Team
Ryan Yglesias
(407) 278-2713
Ryan.Yglesias@dot.state.fl.us
Contractor
CWR Contracting, Inc.
For Media Inquiries Only
Lane Closures
  • Sunday, August 16 to Thursday, August 20, from 8 p.m. to 6 a.m. the following morning: Motorists can expect intermittent single-lane closures in the inside and outside lanes of northbound and southbound S.R. 436 between Lake Howell Road and Casselton Drive. These closures are necessary for crews to perform milling and paving work.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!

  • Monday, August 17 to Friday, August 21, from 8 a.m. to 5 p.m.: Motorists can expect intermittent single-lane closures in the right turn lanes of northbound and southbound S.R. 436 from Lake Howell Road to Winter Woods Boulevard. These closures are necessary for crews to perform concrete work.

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!