Project Details
Work Type: Resurfacing
Phase: Design
Length: 1.82 miles
City:
County:
Road:
Design Cost: $1.4 Million
Letting: 09/04/2024
Estimated Costs
Construction Cost: $3.2 Million
About

This project plans to resurface State Road (S.R.) A1A from South 8th Street to North 18th Street in Flagler Beach to extend the life of the existing roadway. Pedestrian improvements are planned, including the potential for upgrading some existing midblock crossings to have Pedestrian Hybrid Beacons (PHBs).

Reconstruction of pedestrian curb ramps to comply with current Americans with Disabilities Act (ADA) standards is included.

Contact Information
Design Firm
Garrett Engineering Group, Inc.
Design Project Manager
Ty Garner
(386) 943-5299