448795-1 SR A1A Resurfacing from S 8th St to N 18th St
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Design |
Length: | 1.82 miles |
City: | |
County: | |
Road: | |
Design Cost: | $1.4 Million |
Letting: | 09/04/2024 |
Estimated Costs
Construction Cost: | $3.2 Million |
---|
About
This project plans to resurface State Road (S.R.) A1A from South 8th Street to North 18th Street in Flagler Beach to extend the life of the existing roadway. Pedestrian improvements are planned, including the potential for upgrading some existing midblock crossings to have Pedestrian Hybrid Beacons (PHBs).
Reconstruction of pedestrian curb ramps to comply with current Americans with Disabilities Act (ADA) standards is included.
Get Involved
A public meeting about this project was held July 20, 2023. Please see the meeting information in the files below.
Contact Information