Project Details
Work Type: Resurfacing
Phase: Design
Length: 2.433 miles
City:
County:
Road:
Design Cost: $1 Million
Letting: 09/27/2023
Estimated Costs
Construction Cost: $2.5 Million
About

The intent of this project is to rehabilitate the asphalt pavement on U.S. 1 (Indian River Lagoon National Scenic Byway) from north of Rocky Point Road to Malabar Road (State Road 514) in Brevard County.

The proposed improvements would repave the northbound travel lanes and shoulders within the project limits.

This project also includes a proposed 6-foot-wide sidewalk on the southbound side of Orange Avenue to eliminate an existing gap.