Project Details
Work Type: Resurfacing
Phase: Construction
Length: 1.268 miles
City:
County:
Road:
Construction Cost: $8.2 Million
Project Start: Early 2023
Est. Completion: Summer 2024
About

The project will repave U.S. 27/U.S. 441 from Morse Boulevard to north of SE 178th Place to extend the life of the existing roadway. The project will also construct nearly 1.3 miles of new sidewalk on both sides of the roadway to close gaps throughout the entire project limits. To improve operations and help relieve congestion, the left turn lanes at the signalized intersections will be modified to make more space for vehicles. Traffic signals also will be upgraded. Additional improvements include new pedestrian signals and crosswalks, as well as drainage upgrades.

Contact Information
Communications Team
Matt Young
(352) 326-7744 / (352) 620-3020
MattA.Young@dot.state.fl.us
Contractor
Ranger Construction Industries, Inc.
For Media Inquiries Only
FDOT-D5Comm@dot.state.fl.us
Lane Closures
  • There are no lane closures at this time.