Project Details
Work Type: Resurfacing
Phase: Design
Length: 4.551 miles
City:
County:
Road:
Design Cost: $2.2 Million
Letting: 08/30/2023
Estimated Costs
Construction Cost: $15.7 Million
About

The purpose of the project is to resurface State Road (S.R.) 100 to extend the service life of the existing roadway. Improvements include constructing 6-foot-wide sidewalk to close sidewalk gaps where existing right of way allows and improving pedestrian features at intersections within the project limits. The project also plans to upgrade traffic signals at two existing intersections with new signal poles, and install Wrong Way Driving devices at the I-95 interchange off-ramps.

A public meeting for this project was held on June 16, 2022. Please the public meeting information in the files below.

Contact Information
Design Project Manager
Shelley ChinQuee
(386) 943-5439
Shelley.ChinQuee@dot.state.fl.us
Design Firm
Tetra Tech, Inc.