Project Details
Phase: Construction
Length: 4.778 miles
County:
Road:
Project Start: Spring 2023
Est. Completion: Late 2027
About

The Sand Lake Road (State Road (S.R.) 482) and Interstate 4 (I-4) interchange provides a vital gateway to some of Central Florida’s biggest attractions. The interchange is being reconstructed as a diverging diamond (DDI). Unlike a conventional interchange, the lanes in a DDI cross over to the left side of the roadway at a traffic signal. This limits the number of traffic signal phases and allows drivers to make left turns without crossing oncoming traffic. The lanes then cross back to the right side of the road at another traffic signal. 

The project is also reconfiguring and lengthening ramps at the interchange and improving capacity on Sand Lake Road and Turkey Lake Road.

new loop ramp system opened in May 2026, eliminating left turns from westbound Sand Lake Road to southbound Turkey Lake Road. The loop ramp system provides a direct connection to Turkey Lake Road from westbound Sand Lake Road and westbound I-4.

In addition, the project includes reconstructing the I-4 general use lanes from west of Sand Lake Road to the end of the I-4 Ultimate project. Two westbound, barrier-separated, express lanes are being built from west of Sand Lake Road to connect to the existing express lanes near Kirkman Road. These will transition to a single, buffer-separated express lane in the westbound direction from west of Sand Lake Road and tie in just west of Central Florida Parkway. This express lane will be constructed in three separate projects, with the finished lane extending from west of Sand Lake Road to west of S.R. 536.

Construction began in Spring 2023 and is anticipated to reach completion in 2027. This project is being constructed in conjunction with FPID No. 444315-3, the combined construction cost is $219,342,910.12

For the most up-to-date information and status on this project, please visit I4Beyond.com/SandLake.

Contact Information
Contractor
Lane Construction Corp. (The)
Communications Team
Michael Citro
(407) 506-8443