EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Interchange Construction
Phase: Design
Length: 0.225 miles
City:
County:
Road:
Letting: 02/02/2021
Estimated Costs
Construction Cost: $1.6 Million
About

The purpose of the project is to improve operations by signalizing the intersection of U.S. 1 (State Road (S.R.) 5) and the S.R. 404 eastbound ramps, as well as widening to construct a 12-foot-wide travel lane from the S.R. 404 eastbound off ramp to the S.R. 404 overpass.

 

Adding the travel lane at this location will help eliminate the merging actions from drivers coming off the S.R. 404 westbound ramp to U.S. 1, and help reduce potential crash points. Improvements also include widening and constructing dual right turn lanes at the S.R. 404 eastbound off ramp to U.S. 1.

Contact Information
Design Project Manager
Eliode Joseph
(386) 943-5388
Eliode.Joseph@dot.state.fl.us
Design Firm
KPM Franklin
(407) 410-8624
Project Files