Project Details
Work Type: Resurfacing
Phase: Construction
Length: 0.4 miles
City:
County:
Road:
Construction Cost: $1.3 Million
Est. Completion: Summer 2022
About

This project will enhance safety on Oakridge Boulevard (State Road (S.R.) 430) from the east side of the Halifax River to S.R. A1A. The work will reduce the number of travel lanes from three to two and create a 7-foot-wide buffered bicycle lane. Other improvements include a dedicated left-turn lane from Oakridge Boulevard onto Halifax Avenue, repaving Oakridge Boulevard to extend the life of the existing roadway, and landscaping enhancements. Additional pedestrian and bicycle improvements are also included in the project such as upgrading existing sidewalks and a bicycle lane transition at Grandview Avenue. A bicycle lane transition provides a place where bicyclists can safely and easily access the sidewalk from the bicycle lane. 

Contact Information
Communications Team
Amber Mullins
386-740-3566
Amber.Mullins@dot.state.fl.us
Contractor
P & S Paving, Inc.
Lane Closures
  • Continuous single lane closures on Oakridge Boulevard from just west of N. Halifax Avenue to S.R. A1A. The closures are expected to last approximately two months. Please follow posted signs and use caution. Schedule subject to change.