EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Central Florida Roads

Florida Department of Transportation

Project Details
Work Type: Resurfacing
Phase: Design
Length: 3.609 miles
County:
Road:
Letting: 10/05/2021
Estimated Costs
Construction Cost: $10 Million
About

This project will include resurfacing State Road (S.R.) 442 (Indian River Boulevard) from Interstate 95 (I-95) to U.S. 1 in Edgewater, constructing a sidewalk and shared-use path and implement the wrong way detection countermeasures at the I-95 and S.R. 442 Interchange.

 

Additional safety improvements include providing 6-foot-wide buffered bicycle lanes throughout the project limits, reconstructing pedestrian curb ramps, and installing detectable warning surfaces at all curb ramps, minor signal adjustments, pedestrian signal improvements, and minor lighting at the intersection of Air Park Road and U.S. 1.

A new 6-foot-wide sidewalk on the north side of S.R. 442, and a 12-foot-wide asphalt shared-use path on the south side of S.R. 442 will begin at I-95 and tie into Air Park Road.  

Contact Information
Design Firm
SRD, Inc.
(813) 621-3250
Design Project Manager
Heidi Trivett
(386) 943-5466
Heidi.Trivett@dot.state.fl.us