EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Central Florida Roads

Florida Department of Transportation

Project Details
Work Type: Widening
Phase: Design
Length: 5.327 miles
County:
Road:
Estimated Costs
ROW Cost: $8.8 Million
Construction Cost: $102.8 Million
About
This project consists of widening and reconstructing State Road (S.R.) 40 from the end of the four-lane section to east of County Road (C.R.) 314.  The new roadway will have two 12-foot-wide lanes in each direction separated by a 40-foot-wide grassed median.  A 12-foot-wide multi-use trail will run along the north side of the road from NE 60th Court to Ray Wayside Park near the Ocklawaha River Bridge.

This project also includes the replacement of the Ocklawaha River Bridge with two bridges at a lower profile.  Wildlife crossings are provided throughout the project. 

Contact Information
Design Project Manager
Kathleen Enot
(386) 943-5149
kathleen.enot@dot.state.fl.us
Design Firm
Horizon Engineering Group, Inc.