View project: U.S. 192 (S.R. 530) from U.S. 27 to Orange County Line
-
Monday, May 10, through Friday, May 15, 7 a.m. to 5 p.m. and 7 p.m. to 5:30 a.m.: Single rotating outside eastbound and westbound lane closures, as well as double-lane closures as needed, are expected on U.S. 192 in the project limits for paving and westbound only for sidewalk installation.
FDOT is committed to building a transportation system that not only fits the current needs of Florida’s residents and visitors but also enhances mobility throughout the state to accommodate its consistent and rapid growth.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!