Launch Recite Me assistive technology

exclamation point FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Sidewalk
Phase: Design
Length: 0.01 miles
Design Cost: $0.00
Estimated Costs
ROW Cost: $0.00
Construction Cost: $0.00
About

The project at the intersection of State Road (S.R.) US 17/92/ 441 at Wetherbee Road / Ginger Mill Blvd in Orange County is intended to enhance overall safety and improve traffic operations. A traffic services study conducted by the Department determined that a new crosswalk with Right Turn Overlap Additions at this location.

As part of the Traffic Operations Pushbutton Program, the project includes Right Turn Overlap Additions to improve visibility and nighttime safety.