Project Details
Work Type: Lighting
Phase: Design
Length: 0.01 miles
Design Cost: $100,000
Estimated Costs
Construction Cost: $500,000
About

A traffic study conducted by the Department has determined that a new traffic signal is warranted at the intersection of I-75 NB Exit Ramp at County Road (C.R.) 475 in Sumter County. The installation of this signal is intended to improve overall safety and enhance traffic operations at the intersection.

As part of the Traffic Operations Pushbutton Program, the project will include the design and installation of a new traffic signal system, along with upgraded intersection lighting to improve visibility and nighttime safety.