450644-1 Nova Road (S.R. 5A) from Flomich Street to U.S. 1
Project Details
| Work Type: | Resurfacing |
|---|---|
| Phase: | Construction |
| Length: | 3.91 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $10.1 million |
| Project Start: | Fall 2026 |
| Est. Completion: | Summer 2027 |
About
The Florida Department of Transportation (FDOT) is milling and resurfacing nearly 4 miles of Nova Road (State Road (S.R.) 5A) from Flomich Street north to U.S. 1. There will also be safety and operational improvements from Granada Boulevard (S.R. 40) to Wilmette Street. The design will replace portions of the existing two-way left-turn center lane on that section of Nova Road with a raised median. Left turn lanes and U-turn opportunities will be provided to maintain access. The project will also install a new traffic signal at Old Kings Road.
Further south, the existing open median will be replaced with a directional median at Arroyo Parkway. This change will allow left turns onto Arroyo Parkway from Nova Road. However, traffic turning from Arroyo Parkway to Nova Road will have to turn right.
Other improvements include upgrading traffic and pedestrian signals, enhancing lighting at all signalized intersections, and reconstructing pedestrian curb ramps as needed to comply with current Americans with Disabilities Act (ADA) Standards.
Contact Information
Lane Closures
- There are no lane closures at this time.