Work Type: Resurfacing
Phase: Design
Length: 2.511 miles
City:
County:
Road:
Design Cost: $2 Million
Letting: 08/26/2026
Estimated Costs
Construction Cost: $8.7 Million
About

The Florida Department of Transportation (FDOT) plans to make improvements along State Road (S.R. 44) from west of I-95 to east of South Walker Drive in New Smyrna Beach. This project will resurface the corridor and make lighting and signalization  improvements at the I-95, Colony Park Road, and South Glencoe Road intersections. limited sidewalk construction and curb ramp reconstruction as needed to meet Americans with Disabilities Act (ADA) standards, as well as minor drainage improvements are included.

Additionally, the Volusia-Flagler Transportation Planning Organization (TPO) will fund the construction of a new  multi-use trail near the I-95 interchange. At Sugar Mill Drive, the existing traffic signal is being reconstructed by a private developer.

Get Involved

A project open house to present the design and receive community feedback was held on Thursday, September 11. Please see open house materials in the files below.

 

 

Contact Information
Design Project Manager
Randy Turner
(386) 943-5207
Randall.Turner@dot.state.fl.us
Design Firm
SRD, Inc.
Project Files