450642-1 SR 44 from I-95 to east of S. Walker Dr
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Design |
Length: | 2.511 miles |
City: | |
County: | |
Road: | |
Design Cost: | $2 Million |
Letting: | 08/26/2026 |
Estimated Costs
Construction Cost: | $8.7 Million |
---|
About
The Florida Department of Transportation (FDOT) plans to make improvements along State Road (S.R. 44) from west of I-95 to east of South Walker Drive in New Smyrna Beach. This project will resurface the corridor and make lighting and signalization improvements at the I-95, Colony Park Road, and South Glencoe Road intersections. limited sidewalk construction and curb ramp reconstruction as needed to meet Americans with Disabilities Act (ADA) standards, as well as minor drainage improvements are included.
Additionally, the Volusia-Flagler Transportation Planning Organization (TPO) will fund the construction of a new multi-use trail near the I-95 interchange. At Sugar Mill Drive, the existing traffic signal is being reconstructed by a private developer.
Get Involved
A project open house to present the design and receive community feedback was held on Thursday, September 11. Please see open house materials in the files below.
Contact Information
Design Project Manager |
---|
Randy Turner
(386) 943-5207
Randall.Turner@dot.state.fl.us
|
Design Firm |
SRD, Inc.
|